Outline Description of Computer Program 'AQUARIUS'

Purpose

Interactive and user-friendly simulation of integrated power and water resource system operation. Optimisation of stored water values and system operating policies. top


Programming Language(s)

MS Visual Basic, Version 6. top


Program Authorship

Ken Howard (2000-02) ; Tim Wyatt (2002-) top


Operating Systems

Microsoft Windows 95, 98, NT4, 2000 and XP. top


Software Security

Hardware protection device ('dongle') top


Simulation Time Step

Variable (user defined); daily, weekly or calendar monthly. top


Generalisation Level

Full. top


Input Data Editing

Direct using on-screen templates. top


Special Features

(i) Specific (optional) consideration of transmission lines (including losses), multiple electricity and water demand areas, monthly maximum and minimum plant outputs;

(ii) On screen definition of system components and configuration ('drag and drop');

(iii) Coincident optimisation of water flows (reservoir releases), generation plant load dispatch and aqueduct & transmission line flows;

(iv) Reservoir operating policies defined by calendar weekly or monthly varying long-term stored water values;

(v) Electricity demands, water demands and inflows can be input as seasonally varying (profiled) quantities or as time series;

(vi) Up to 24 load dispatch blocks, with the facility to specify individual minimum and maximum generating plant outputs by block;

(vii) Explicit consideration of demand area dependent supply deficit costs and preventive rationing measures;

(viii) Real-time graphical outputs showing user selected (daily) reservoir contents, generating plant outputs, river reach and transmission line flows.

(ix) Automatic storage of results in MS-ACCESS database format for subsequent viewing and retrieval.

(x) Calculation of marginal costs by load block at electricity demand centres and transmission nodes, and at water demand areas.

(xi) Mimic diagram displays of simulation results. Average, daily and individual load block values can be shown.

(xii) Graphical, tabular and spreadsheet compatible file outputs for any combination of simulation time series values.

top


Optimisation Methods Employed

Reservoir Release / Load Dispatch Optimisation : (Proprietary) Linear Programming (LP) algorithm.

Operating Policy Optimisation : (Proprietary) Stochastic Value Iteration Dynamic Programming (DP) Algorithm. top


Help System

On-line indexed system. top


Related PWSC Software

None. top


Third Party Software Compatibility

Simulation outputs in MS ACCESS .MDB format. top


Systems Applied To

Demonstration system: 5 reservoirs, 3 hydro plants, 1 pump storage unit, 2 thermal plants, 2 wind plants, 10 transmission lines, 2 transmission nodes, 2 electricity demand areas, 16 rivers, 5 flow points, 3 river abstractions, 1 treatment works, 1 pumping station, 9 aqueducts and 5 water demand areas.

United Utilities Water Integrated Water Resource/Supply System: 19 reservoirs, 44 river reaches, 29 flow points, 13 river abstractions, 11 water sources, 19 treatment works, 14 pumping stations, 36 supply aqueducts, 74 transfer aqueducts, 16 junction points and 23 water demand areas. top


Potential Applications

Short and long-term operations and system development planning.

Economic evaluation of alternative IPP proposals. Optimisation of stored water values for privatised system operation. Load dispatch optimisation, with or without (load flow) transmission constraints. top


Further Developments

top


Current Availability

Available for on-site demonstration. top


Indicative Prices

Perpetual User Licences (Per PC or Workstation):
Water Resource/Supply Systems:Simulation £POA - Simulation & Optimisation £POA.
Power & Water Resource/Supply Systems: Simulation £POA - Simulation & Optimisation £POA.

Annual User Licences are also available. top


Related Consultancy Services

Creation of client system model input files, installation, model functioning verification, user training, bespoke enhancements. top

Purpose
Programming Language(s)
Program Authorship
Operating Systems
Software Security
Simulation Time Step
Generalisation Level
Input Data Editing
Special Features
Optimisation Methods Employed
Help System
Related PWSC Software
Third Party Software Compatibility
Systems Applied To
Potential Applications
Further Developments
Current Availability
Indicative Prices
Related Consultancy Services

Read more about Aquarius

Click Here For Aquarius Presentation

Part of Aquarius Mimic Diagram

 

top
5 Lambridge Wood Road, Henley-on-Thames, Oxfordshire, RG9 3BP, United Kingdom
Tel: +44 (0)1491 578860 : Fax: +44 (0)1491 410780 : E-Mail: info@pwsc.co.uk
© Copyright Power & Water Systems Consultants Ltd. 2007. ALL RIGHTS RESERVED
Water Resource & Hydro-Thermal Power Systems Modelling - Optimization of Large-Scale Hydropower System Operations - Power Generation Optimisation