Power engineering firm assisted by PWSC on Transkei hydroelectric simulations.
In 1988 PWSC carried out simulations for the operation of existing and proposed hydroelectric schemes in the Transkei on behalf of Merz and McLellan. The work examined operational strategies and energy outputs for different development configurations.