Papers & Publications
Power & Water Systems Consultants
Tel: +41 (0) 79 663 4549
info@pwsc.co.uk

Glossery Of Terms

Victoria Dam (Sri Lanka)

Planning reserve margin
Power system expansion planning
The percentage by which installed dependable capacity exceeds forecast peak demand in each year.
The planning reserve margin is a widely used indicator of capacity adequacy in expansion studies. It is defined as dependable capacity minus peak demand, expressed as a percentage of peak demand. Optimisation models can enforce minimum reserve margins as constraints when selecting and timing new generation projects.
top
Tel: 41 (0) 79 663 4549 : E-Mail: info@pwsc.co.uk
© Copyright Power & Water Systems Consultants. 2026. ALL RIGHTS RESERVED
Water Resource & Hydro-Thermal Power Systems Modelling - Optimization of Large-Scale Hydropower System Operations - Power Generation Optimisation