Papers & Publications
Power & Water Systems Consultants
Tel: +41 (0) 79 663 4549
info@pwsc.co.uk

Glossery Of Terms

Victoria Dam (Sri Lanka)

Time step selection for models
Modelling and optimisation
Choice of the modelling period length, for example hourly, daily or monthly, when representing system behaviour.
Selecting an appropriate time step is a key part of model design. Short time steps capture detailed operational patterns and short term reliability, but increase run times and data requirements. Longer time steps are suitable for long term screening and expansion studies. PWSC software allows different time step choices according to study objectives.
top
Tel: 41 (0) 79 663 4549 : E-Mail: info@pwsc.co.uk
© Copyright Power & Water Systems Consultants. 2026. ALL RIGHTS RESERVED
Water Resource & Hydro-Thermal Power Systems Modelling - Optimization of Large-Scale Hydropower System Operations - Power Generation Optimisation