Planning of new transmission lines and substation reinforcements required to support generation development and demand growth.
Transmission expansion planning identifies the reinforcements to the high voltage network that are required to move power from generation centres to load areas while respecting security criteria and voltage limits. In integrated studies, generation and transmission additions are planned together so that network constraints are explicitly considered when selecting development strategies.